Coordinated environmental permit applications

An installation may need several separate permits and notifications drawing on the same technical information. We coordinate their preparation outside a single integrated permitting procedure, keeping the agreed documents consistent with the actual activity and the proposed modification or commissioning of the facility.

Separate procedures built on shared installation data

We first review the installation's activities, existing documents and the purpose of the package. We identify areas needing an individual application or notification and data shared by several documents. For a modernisation, it is important to distinguish unchanged parameters from those affecting existing documentation and the scope of the next procedural steps for the installation.

We organise preparation activities and specialist contributions. Common assumptions about capacity, operating hours and processes are carried into the relevant documents. Descriptions and schedules are checked so that submissions for different environmental topics do not present conflicting versions of the installation. Information and appendices specific to each separate procedure are identified alongside the shared material.

The package includes only the agreed applications and notifications identified for the scope reviewed. It does not merge separate procedures into one decision or replace an integrated permit. Clear separation of documents and their dependencies helps the client's team coordinate its own work and update information when parameters change before commissioning or during operation.

Technical data

Subject Installation permits and notifications outside one integrated permitting procedure
Service type Coordinated package of separate environmental applications
Assessment basis and requirements The installation's activities, existing decisions and documentation requirements identified separately for each environmental topic.
Method
  1. Identify applications and notifications relevant to the defined activity.
  2. Agree shared data and requirements specific to each procedure.
  3. Coordinate specialists and prepare the agreed package components.
  4. Check parameter consistency and dependencies between the documents.
Delivery model KFB Enviro with a partner/subcontractor

What you receive

You receive the agreed package of applications and notifications, organised by topic and procedure. Documents use shared installation data while identifying material specific to each matter. This helps the operator or developer coordinate information preparation and subsequent steps, with a clear understanding of what each document covers and which decisions or inputs it depends on.