Back

Notification of an installation emitting to air

An installation subject to notification needs a clear technical and emissions description suited to that procedure. We prepare the notification, assemble equipment, process and operating information, and explain the evidence supporting the air emissions described for the installation and its intended use.

The right information for an installation notification

We begin by understanding the installation and reviewing the proposed documentation route. We establish which equipment and processes need to be described and what information the operator, developer or supplier should provide. For commissioning, project assumptions must be distinguished from confirmed data for installed equipment; for modifications, the extent of the documentation update also needs to be defined.

We organise the technology description, operating hours, materials used and information on emissions to air. Technical information and schedules are checked for consistency with each other and with intended use. Missing information needed for the notification is identified, and the documentation is structured so that equipment, processes and reported emission parameters can be clearly connected.

An installation notification is distinct from an emissions permit application. We do not assume that the notification route is appropriate simply from an equipment name. If the identified parameters indicate a need to reconsider the procedure, we explain this before finalising the material. The resulting documentation reflects the agreed installation scope and explicitly understood assumptions.

Technical data

Subject An air-emitting installation covered by the notification procedure
Service type Installation notification with technical and emissions data
Assessment basis and requirements Installation characteristics, equipment and process data, and the information scope applicable to the identified notification procedure.
Method
  1. Review the installation and the proposed documentation route.
  2. Collect equipment, material and planned operating-time information.
  3. Organise emissions data and clarify missing parameters.
  4. Prepare the notification and check consistency across its components.
Delivery model KFB Enviro with a partner/subcontractor

What you receive

You receive installation notification documentation with the agreed technical and emissions data. It describes the equipment, intended use and assumptions relevant to the emissions presented. The material is prepared for the defined installation and identified notification route, with clear links between source information and the parameters supplied for subsequent formal steps.

Where this service applies